A heavily customized SAP or Oracle ERP, a supply chain run on spreadsheets and EDI, and plant-floor systems that never talk to the front office. We modernize the flows across your ERP, sites, and shop floor — fixed scope, about twelve weeks, not an eighteen-month program.
Manufacturers run on ERP systems that took years to customize and now resist change. Around them sits a supply chain stitched together with EDI, spreadsheets, and supplier portals, and underneath sits a plant floor of historians, MES, and SCADA that speaks an entirely different language. Each site has its own way of doing things, its own master data, its own workarounds. The information a planner needs to make a decision is spread across three layers that were never designed to connect.
We modernize the flows that cross those layers without an ERP re-implementation. We integrate SAP or Oracle through supported interfaces, automate the supply-chain and multi-site processes that today run on email and re-keying, and bridge OT to IT so plant data informs planning. Read-first on the shop floor, so production is never at risk. Fixed scope, fixed price, roughly twelve weeks — not a multi-year transformation office.
Three workstreams that connect the front office, the supply chain, and the plant floor — without disrupting production.
The return shows up fastest where data crosses the ERP, the supply chain, and the plant floor today by hand:
Yes. We integrate with your existing SAP or Oracle ERP through supported interfaces — IDocs, BAPIs, OData, and middleware — rather than forcing an S/4 or Fusion upgrade. We modernize the workflows and data flows around the ERP, so planning, procurement, and shop-floor systems share clean data while the ERP of record stays put.
We bridge OT and IT through read-first integration at the historian, MES, and SCADA layer, so plant data flows up to ERP and analytics without touching control logic. Write-backs to operational systems are added only with plant engineering sign-off and tested offline, so modernization never puts production or safety at risk.
Thirty minute briefing. We map your ERP, supply-chain processes, and plant-floor systems, and where modernization removes the most manual reconciliation. You leave with a fixed-scope path and ROI memo. Response inside 24 hours.